102
In many control systems, the need for a method of properly shutting down the controller on a power loss is needed in order to manage various ‘engines’ of the NJ/NX CPU’s.
This paper will demonstrate the proper way to manage a power loss to the NJ501-1340 SECS/GEM controller. Similar routines can be used for SQL & Robotics CPU’s.